Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Communication Systems Reference and Training Manuals
>
> Installation, Maintenance, Recovery, and Service of Telephone Cable WD-1(
Lesson 1. Installation
Part A. Safety
First aid for electrical shock.
Part B. Equipment Used in Installation
Telephone cable WD-1( )/TT.
Figure 1-1. Field wire WD-l/TT
Figure 1-3. Field wire WF-16/U.
Axle RL-27( ).
Figure 1-7. Method of recovering field wire, using axle RL-27(*).
Figure 1-8. Reel unit RL-31( )
Electrical or friction tape.
Figure 1-10a. Climbing equipment.
Figure 1-10b. Climbers LC-240/U.
Figure 1-11. Gaff gage.
Tags are important for circuit marking.
Figure 1-14. Wire tagging code.
Figure 1-15. Telephone set TA-312/PT.
Figure 1-16a. Marlin cord.
Figure 1-16b. Hammer.
Part C. The Installation
Part C. The Installation-cont. - SS04400027
Figure 1-17. TA-312/PT installation.
Part C. The Installation-cont. - SS04400029
Part C. The Installation-cont. - SS04400030
Part C. The Installation-cont. - SS04400031
Figure 1-18. Lashing lance poles.
Other methods of crossing a road.
Another method of getting across the road is to bury the line.
Crossing a railroad.
Figure 1-22. Wire crossing under railroad tracks.
Constructing field wire lines under unusual conditions.
Constructing field wire lines under unusual conditions-cont.
Lesson 1 Practice Exercise - SS04400040
Lesson 1 Practice Exercise-cont. - SS04400041
Lesson 1 Practice Exercise-cont. - SS04400042
Lesson 1 Practice Exercise-cont. - SS04400043
Lesson 1 Practice Exercise-cont. - SS04400044
Lesson 1 Practice Exercise-cont. - SS04400045
Lesson 1 Practice Exercise Answer Key and Feedback - SS04400046
Lesson 1 Practice Exercise Answer Key and Feedback-cont. - SS04400047
Lesson 2: Maintenance
Part A. Splicing WD-1 ( )/TT
Figure 2-2. Removing insulation from field wire conductors.
Figure 2-4. Square knot with seizing wire.
Figure 2-5. Square knot without seizing wire.
Part B. Splicing WF-16/U
Figure 2-7. Tie single sheet bend.
Figure 2-8. Tape knot with friction tape.
Figure 2-11. Insert conductors in UIR.
Figure 2-14. Press E9B crimper to flatten red top.
Part C. Troubleshooting
Part C. Troubleshooting-cont. - SS04400059
Part C. Troubleshooting-cont. - SS04400060
Lesson 2 Practice Exercise - SS04400062
Lesson 2 Practice Exercise-cont. - SS04400063
Lesson 2 Practice Exercise-cont. - SS04400064
Lesson 2 Practice Exercise Answer Key and Feedback - SS04400065
Lesson 3: Recovery and Service
Part A. Recovery
Part B. Servicing
Part B. Servicing-cont.
Lesson 3 Practice Exercise - SS04400071
Lesson 3 Practice Exercise-cont. - SS04400072
Lesson 3 Practice Exercise Answer Key and Feedback - SS04400073
Installation, Maintenance, Recovery, and Service of Telephone Cable WD-1( )/TT or WF-16/U