2.
Maintenance and repair materials. The list of maintenance and repair materials in Table 1-2 is
provided for information purposes only. The actual requirements for materials will vary, depending
upon the size and type of outside plant being maintained at the particular location.
Table 1-2. List of maintenance and repair materials.
PART C - DIGGING THE POLE HOLE
1.
General. The line layout crew indicates on the stake for each pole, the location, size and class of
the pole, and the size and number of guys. The line layout crew also places stakes for the anchor
locations. The spacing of poles is more exact for lines supporting transposed open wire than for those
supporting aerial cable only.
1-7
SS0439