PERFORMANCE MEASURE 2
DETERMINE SUPPORT REQUIREMENTS
Now that you understand the contents and purpose of the OPORD and LOI it is
time to use this knowledge to actually select a team radio site. At Annex B we
have provided a checklist of all the necessary steps to take but for this
exercise we will go through it step-by-step analyzing each substep required.
Situation
For this exercise you are the team chief of an AN/GRC-142/122(*). You have two
SM as your team members. By VOCO, you have been assigned the mission of Team
Three from the LOI. You have been given both a copy of the LOI and OPORD.
1.
Receive Instructions (Refer to OPORD, LOI and VOCO).
a.
Your mission is:
Install, operate and maintain the Division Alternate Radio net.
b.
You are to:
Select a team radio site in the immediate vicinity of the Division
Alternate Command Post.
c.
You will be:
NCS in the absence of Team One.
d.
You will provide:
Other services as directed.
2.
a.
You will use:
Series V 745.
b.
Map scale is:
1:50.000.
c.
Division Alternate CP is located at:
LG 76559160.
3.
Determine Support Requirements.
a.
Fuel.
(1)
Length of exercise: Approximately 8 hours.
23