6.
Who has overall responsibility for joint planning of frequency management and engineering?
A.
NSA
B.
J6
C.
JCS
D.
C6
7.
Factors such a cryptographic equipment, key lists, frequency allocations, and types of radios
available must be considered when planning for what?
A.
SOI
B.
Hopsets
C.
CEOI
D.
MSRT
8.
Who is responsible for controlling and distributing FH variables and SOI materials?
A.
Frequency manager
B.
BSO
C.
C6
D.
J6
1-29
SS0133