LESSON 1
bellows for front to rear leveling. Drain the water from the tray by
depressing this drain bellow. Take out the solution tray and empty the
drain bottle. Replace the bottle and the tray.
(4) As shown in Figure 114, place the processing rack assembly on
in the recesses of the solution tray. After verifying the rack gear is
meshed with the base idler gear, snap the holddown latch over the shaft.
Figure 114. Rack assembly on the solution tray
(5) Assemble the Housing Assembly (fig 115) on the processor by
tilting the front upward and toward the rear of the processor, hooking the
Rod under the two brackets fastened at the rear of the processor base and
then lowering the front of the housing assembly.
38