LESSON 3
PRACTICE EXERCISE
ANSWER KEY AND FEEDBACK
Item
Correct Answer and Feedback
1.
C.
MI battalion signal officer.
for developing, staffing, and producing the signal
mission. (page 3-1, para 1)
2.
A.
True.
The signal annex is an integral part of an OPLAN or
OPORD, and it identifies signal support requirements
to support the unit's mission. (page 3-1, para 1)
3.
D.
All of the above.
Some key planning considerations for single-channel
terrain,
siting,
and
COMSEC.
(page
3-4,
para
3a(1)(2)(4))
4.
B.
False.
The initial selection of a route for laying wire is
made on the basis of a map study. The final selection
done. (page 3-5, para 3b(1))
5.
A.
True.
the weather and the condition of the wire. (page 3-5,
para 3b(2))
3-11
SS0125