LESSON 3
PRACTICE EXERCISE
The following items will test your grasp of the material covered in
this lesson. There is only one correct answer for each item. When
you complete the exercise check your answer with the answer key that
follows.
If you answer any item incorrectly, study again that part
of the lesson which contains the portion involved.
1.
The
is primary responsible for developing, staffing, and
producing the signal annex to support the MI battalion in
conducting its mission.
A.
B.
Division signal battalion S3.
C.
D.
Both A and B.
2.
The signal annex
is an integral part of an OPLAN, and it
identifies signal
support requirements to support the unit's
mission.
A.
True.
B.
False.
3.
A
key
planning
consideration
for
single-channel
radio
.
A.
The characteristics of the terrain.
B.
Siting.
C.
COMSEC.
D.
All of the above.
4.
The final selection of a route for laying wire lines is made on
the basis of reviewing maps and aerial photographs of the
terrain.
A.
True.
B.
False.
5.
The weather and the wire's condition can limit the range of wire
lines.
A.
True.
B.
False.
3-9
SS0125