6.
Where is the cable tagged during culvert construction?
A.
At the culvert
B.
Between the culvert and the stake
C.
Before the stake where it comes back to the road
D.
On the standing and running end
7.
How deep is the trench for a buried road crossing?
A.
4
to
8 inches
B.
5
to
10 inches
C.
6
to
12 inches
D.
7
to
14 inches
8.
How far from the stake is a tag placed?
A.
4 inches
B.
6 inches
C.
8 inches
D.
10 inches
9.
What is the speed of information through a TD-1219?
A.
2304 kb/s
B.
8616 kb/s
C.
19,200 kb/s
D.
19,304 kb/s
10.
What are the intersections called on a line route map?
A.
Coordinate marks
B.
Map marks
C.
Longitude marks
D.
Register marks
11.
How many crossovers are there in a basket hitch tie?
A.
Four
B.
Five
C.
Six
D.
Seven
SS0444
2-20