f. Assembly of stabilizer and activator valve assemblies to chemical
supply bottles.
(1) Remove the cap from each of
the
one-quart
chemical
supply
bottles.
(2) Screw a valve assembly onto
each bottle as shown in figure
3-11.
(3) Tighten each valve assembly
securely.
FIGURE 3-11. Assembly of
stabilizer and activator valve
assemblies to chemical supply
bottles.
3-7
Checking Installation
a. Before applying power to the print processor, remove the feed shelf
(figure 3-1) and remove the housing assembly [para 3-12d(6)].
b. Check that the gear latch (figure 3-8) is securely positioned over
the rack drive gear shaft.
c. Rotate the rack gear by hand to ascertain that all other gears and
rollers operate smoothly.
197