thoroughly rinsing it in cool water for 5 minutes.
Place the processing
rack assembly on its frame flanges on a flat surface; allow to drain dry.
f. Base assembly.
Clean only the exterior surfaces of the base
assembly (figure 3-2) with a lint-free cloth moistened with trichloroethane.
caps (figure 3-7) and valve assemblies (figure 3-5) thoroughly in cool water
for 5 minutes; allow them to drain dry.
CAUTION:
Check to see that labels have not been removed from drain
bottles during cleaning.
3-16 Operator's Preventive Maintenance Checks and Services Periods
a. Paragraph 3-17 specifies checks and services that
must
be
accomplished daily and under the special conditions listed below:
(1) when the print processor is initially installed.
(2) when
the
print
processor
is
reinstalled
after
removal
for
any
reason.
(3) at least once each week if the print processor is not used daily,
but is maintained in standby condition (i.e., ready for immediate use).
b. Paragraph 3-18 specifies additional checks and services that must be
performed once each week.
3-17 Operator's Daily Preventive Maintenance Checks and Services
210