Figure 1-53.
Loading 8x10-inch film holder.
1-21. PREPARING LIGHTING SYSTEM.
for operation, first adjust the output converter and then adjust the position
of the light assembly.
a. Converter.
Prepare the converter for operation as follows (fig 1-52):
(1)
Check to be sure that the main power switch is set to OFF.
(2)
Check to be sure that the power cord is connected to the power
source and that input voltage-selector switch is set to the position that
most likely matches the voltage of the power source.
NOTE.
The value of the voltage at the power source will have been
marked on the output receptacle at the time the camera set was
installed by maintenance personnel.
(3)
Set the manual-timer switch to remote time operation.
(4)
Set the main power switch to ON; the pilot light will glow and
(5)
Set the kelvin temperature selector switch to 1.
(6)
68