Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Communication Systems Reference and Training Manuals
>
> Figure 24. Control Panel Assembly
Figure 23. Load Terminals
Table 5. Phase Switch Selection Positions
Install and Operate 3, 5 and 10Kw, (Gas) 5, 10, and 15Kw, Diesel Generator Sets
Page Navigation
38
39
40
41
42
43
44
45
46
47
48
r. Loosen the captive screws and open
control panel assembly
.
(See Figure 24.)
FIGURE
24.
CONTROL
PANEL
ASSEMBLY.
41