(7) Hold the CIRCUIT BREAKER switch in the CLOSE position until
the CIRCUIT BREAKER indicator illuminates.
(8) Observe
all
engine
and
generator
instruments
for
normal
readings.
(9) Refer to Table 8 and perform during operation PMCS.
(See Figure 54.)
(1) Place the CIRCUIT BREAKER switch in the OPEN position.
(2) Ensure
manual
SPEED
control
is
pushed
in
to
idle
down
generator.
(3) Allow the generator set to operate approximately 3 minutes
with no load applied.
(4) Place the START-RUN-STOP switch in the STOP position.
(5) Refer to Table 8 and perform after operation PMCS.