(3) After
engineering
tests
were
conducted
and
before
procurement of the new radio for operational use by the field forces
analyses were thoroughly reviewed to insure that the new equipment
was capable of performing its intended mission without either
(4) The operational allocation for the AN/GRC-103 was approved.
LESSON 3 - EXERCISE 2
Complete items 1 through 5.
is to attain electromagnetic, compatibility through design rather
a.
True.
b.
False.
Program Data Base that contains all current Army, Navy, and Air Force
a.
Equipment Authorization File.
b.
c.
Tactical Deployments File.
d.
Electromagnetic Compatibility Allocation to Equipment File.
3. What
organization is specially
designed to simulate
the
for testing new equipment to support the Army Electromagnetic
Compatibility Program? _______________________________________________
_____________________________________________________________________
4. Electromagnetic compatibility is a vital consideration for
equipment
beginning
with
concept
formulation through the operational phase of the equipment life
cycle.
a.
True.
b.
False.
58