2-5
Preparing Lighting System
below).
a. Converter (figure 10).
Prepare the
converter for
operation as
follows:
(1) Check to be sure that the MAIN POWER switch is set to OFF.
(2) Check to be sure that the POWER CORD is connected to the source
of power and that the INPUT VOLTAGE SELECTOR switch is set to the position
that most nearly matches the voltage of the power source.
NOTE:
The value of the voltage at the power source will have been
marked on the output receptacle at the time the camera set was
installed by higher echelon personnel.
(3) Set the MANUAL-TIMER switch to REMOTE TIMER OPERATION.
FIGURE 10. Converter, showing location of controls,
indicators, and connectors, front view.
26